Load Tracker Installation
1.0 Cock FCI core to open position
2.0 Attach a Shotgun Stick
3.0 Select a mounting postion from below
Small Core Load Tracker
Cable dia meters 0.85" to 1.6"
Mount over Concentric Neutral Foldback
Large Core Load Tracker
Cable diameters 2.4"
Mount over Concentric Neutral Foldback
Large Core Load Tracker
Elbow Mounted
Navigator Installation
Carefully open FCI Core to cocked position. Use Caution when opening to protect fingers.
Attach cocked FCI to shotgun stick.
Place FCI Core over conductor and apply FCI to line using a strong, fast upward thrust.
Remove shotgun stick from FCI.
Fiber Optic Cable Installation