Load Tracker Installation

1.0 Cock FCI core to open position

2.0 Attach a Shotgun Stick
3.0 Select a mounting postion from below




 

Small Core Load Tracker
Cable dia meters 0.85" to 1.6"
Mount over Concentric Neutral Foldback



 

Large Core Load Tracker
Cable diameters 2.4"
Mount over Concentric Neutral Foldback


 

 

Large Core Load Tracker
Elbow Mounted




Load Tracker Navigator Installation



 

Carefully open FCI Core to cocked position. Use Caution when opening to protect fingers.



 

Attach cocked FCI to shotgun stick



  Place FCI Core over conductor and apply FCI to line using a strong, fast upward thrust.

 

  Remove shotgun stick from FCI